Skip to content
allied-concrete-nz-logo

Allied Concrete NZ

allied-concrete-nz-logo-dark
0800 425 5433
Specifiers
Request a Quote
  • Home
  • About Us
    • About Us
    • History
    • Join our Team
    • News & Updates
    • Our Partners & Accreditations
    • Sustainability
  • Concrete Products
  • Our Projects
  • Calculators & Tools
    • Ready Floor Specification Tool
    • Concrete Volume Calculator
    • Ecrete Calculator
    • Request an EPD
    • DesignHub
  • Resources
    • Document Library
    • Concrete Tips & Advice
    • FAQs
    • Allie the Chatbot
    • Terms of Trade
    • Health & Safety
  • Locations
  • Contact Us
    • Contact Us
    • General Enquiry
    • Request a Quote
  • My Concrete App

By Product Categories

  • All Products
  • For Commercial
  • For Residential
  • For Infrastructure
View all Products

All Products

decorative concrete icon Decorative Concrete
  • Ready Products
  • Ready Exposed
  • Ready Glow
  • Ready Colour
  • Ready Polished
nav-low-carbon-concrete Low Carbon Concrete
  • Ecrete™
  • Ecrete™ Plus
Agricultural
  • Farmcrete
nav-new-home-builds Floors & Foundations
  • Ready Now
  • High Performance Fibre-reinforced Concrete
  • SuperSlab
  • SuperSlab+
  • Ready Floor
nav-general-use Standard Concrete
  • Standard Concrete
Engineered
  • Shotcrete
  • Mass Pour
  • Permeable Concrete
  • Engineered Concrete Solutions
  • Waterproof
  • Ready Flow

For Commercial

nav-commercial-builds Commercial Builds
  • Ready Now
  • High Performance Fibre-reinforced Concrete
  • Engineered Concrete Solutions
  • Waterproof
  • Ready Flow
  • Ecrete™
  • Ecrete™ Plus
  • Ready Polished
nav-underground-and-basements Underground & Basements
  • High Performance Fibre-reinforced Concrete
nav-low-carbon-concrete Outdoor & Public Spaces
  • Permeable Concrete
  • Ecrete™
  • Ready Exposed
  • Ready Glow
  • Ready Colour

For Residential

New home builds icon New Home Builds
  • SuperSlab
  • SuperSlab+
  • Ready Floor
  • Ecrete™
  • Ecrete™ Plus
  • Ready Polished
nav-low-carbon-concrete Outdoor & Landscaping
  • Permeable Concrete
  • Ready Exposed
  • Ready Glow
  • Ready Colour
nav-driveways-and-pathways Driveways & Pathways
  • Permeable Concrete
  • Ecrete™ Plus
  • Ready Exposed
  • Ready Colour
nav-general-use General Use
  • Standard Concrete
  • Ready Now
  • Ready Products
  • Ecrete™

For Infrastructure

distribute-spacing-horizontal Roads & Highways
  • Shotcrete
  • Mass Pour
  • Permeable Concrete
  • Engineered Concrete Solutions
nav-decorative-landscaping Marine and Coastal
  • Engineered Concrete Solutions
  • Ecrete™
  • Ecrete™ Plus
nav-driveways-and-pathways Railways
  • Shotcrete
  • Mass Pour
  • Permeable Concrete
  • High Performance Fibre-reinforced Concrete
View all Products

Need an EPD for Your Project?

Our EPD On-Demand service makes it easy to request a third-party verified Environmental Product Declaration tailored to your specific project requirements.

Request an EPD On-Demand
  • About Us
  • Concrete Products
  • Our Projects
  • Calculators & Tools
  • Resources
  • Contact Us
  • Concrete Plant Locations
  • Legal
Tips & Tricks

Setting Time of Concrete

The practical use of concrete as a construction material depends upon the fact that it is ”plastic” in the freshly mixed state and subsequently becomes hard, with considerable strength.

Download PDF
  • Download PDF
  • Product Documents
Technical Resources
  • Setting Time of Concrete PDF

    Setting Time of Concrete

    Last updated on 11 Mar 2025
    0.4 MB
    Download

This change in its physical properties is due to the chemical reaction between cement and water, a process known as hydration. Hydration involves chemical changes, not just a drying out of the material. Hydration is irreversible. The reaction is gradual, first causing stiffening of the concrete, and then development of strength, which continues for a very long time. Under certain ideal conditions it is probable that concrete would continue to increase in strength indefinitely.

Air temperature, ground temperature and weather conditions all play major roles in the rate with which cement hydrates. The setting time of concrete decreases with a rise in temperature, but above 30oC a reverse effect could be observed. At low temperatures setting time is retarded. Proper curing techniques and site preparation will aid the setting time. However when concrete is being used in times of temperature extremes, i.e. colder weather or in the middle of summer, several admixtures may be used in the concrete mix to aid in the placement of the final product. These admixtures are Accelerators and Retarders.

Accelerators have been designed to significantly boost the early setting times and increase the early age strengths of concrete. Setting times of non accelerated concrete are significantly slower as temperatures get colder. This obviously affects finishing times. The action of the accelerator counters this set retardation and shortens setting times back to what is considered a normal set time.

Retarders are designed for use in areas where early setting of concrete is not preferable, e.g. high ambient temperatures, long travel times between concrete plant and job site, large slow pours – to prevent formation of cold joints etc. The chemical composition of the retarder is formulated to temporarily stop the action of hydration, delaying the initial set of the concrete. This delay is proportional to the dose of retarder used. Once the effect of the retarder wears off initial set will take place and hardening will develop at an accelerated rate.

The two graphs below demonstrate the effects of accelerators and retarders on the setting time of concrete.

 

Effect of accelerators on concrete setting time, technical diagramEffect of retarders on concrete setting time, technical diagram

 

Allied Concrete staff are more than happy to help you with any problems or enquiries.

For more information or assistance, please don’t hesitate to call. Your call will be automatically connected to our nearest plant. (Calls from mobile phones will be directed for Auckland or Christchurch.)

 

DISCLAIMER: Allied Concrete has endeavoured to present the best possible information. However we accept no responsibility for the application of the principles discussed.

Download PDF
  • Request a Quote
  • Contact a Sales Rep

Contact Us

message

Contact our team

Submit a General Enquiry

Email Us

Send us an email

Find Location

Use our location finder

Request a Quote

Fill out a form

Subscribe to the Allied Concrete Newsletter

Stay ahead in the industry, subscribe to Allied Concrete's newsletter for expert insights, product updates, and the latest innovations in concrete and construction.

About Us
  • History
  • Join our Team
  • News Updates
  • Our Partners & Accreditations
  • Sustainability
Concrete Products
  • Decorative & Landscape
  • Engineered
  • Floors & Foundations
  • Low Carbon Concrete
  • Normal Concrete
  • Agricultural Concrete
Resources
  • Document Library
  • Concrete Tips & Advice
  • FAQ’s
  • Allie the Chatbot
  • Terms of Trade
  • Health and Safety
Calculators & Tools
  • Ready Floor Specification Tool
  • Concrete Volume Calculator
  • Ecrete Calculator
  • Request an EPD
  • DesignHub
  • My Concrete App
Projects
  • Latest Projects
Other
  • Concrete Plant Locations
Facebook
0800 425 5433
Legal
  • Privacy
  • Terms & Conditions
  • Cookie Policy
  • Social Media Competitions and Giveaways
  • General Enquiry
Request a Quote
Facebook
0800 425 5433
allied-concrete-nz-logo

© 2025 Allied Concrete. All rights reserved.

Setting Time of Concrete Close
Download Your Chosen Document

"*" indicates required fields

By submitting this form, you expressly consent to Allied Concrete using and maintaining your details on record for internal purposes as outlined in our updated Privacy Policy

This field is hidden when viewing the form
ACL Web Agent
Company Logo

Chat with Allie