Skip to content
0800 4 ALLIED 0800 425 5433
Allied Concrete
  • About
    • History
    • Our People
    • Our Projects
      • Dam Bank
      • Wind Farm
      • Waimea Dam
      • Pylon Network Upgrade
      • Invercargill CBD Redevelopment
      • City Rail Link
      • Egyptian Gardens
    • News
    • Sustainability
    • Awards
  • Products
    • Decorative Concrete
      • READY Colour
      • READY Exposed
      • READY Glow
      • READY Polished
    • Eco Concrete Solutions
      • READY Eco-Glass
    • Flooring and Foundations
      • READY Floor
      • READY Super Slab
      • READY Now
    • Structural Concrete
      • Ready Mix Concrete
    • Concrete Sealers, Acids and Thinners
      • READY Products
  • Technical Info
    • Design Resources
    • Concrete Tips & Tricks
    • Tools
      • Ready Floor Calculator
      • Concrete Calculator
      • Weather Advisory
    • Quality Control
    • Terms of Trade
    • Health & Safety
  • Careers
  • Contact
    • Plant Locator
    • General Enquiry
    • Our Team
  • Request A Quote
    • Get a quote for your flooring foundations alternative mesh solution
  • My Concrete App
  • Home
  • About
  • Current: Our Projects

Our Projects

Arapuna Dam1

Arapuni Dam Bank

Allied Concrete’s Cambridge plant has been working at the site to protect the lower toe of the Arapuni Dam Bank.

Read More
Harapaki Wind Farm Mobile Plant 1

Harapaki Wind Farm

Harapaki will be New Zealand’s second-largest wind farm with 41 turbines generating enough to power over 70,000 average households.

Read More
Waimea Dam Embankment Face 2

Waimea Dam

The largest dam built in New Zealand for more than 20 years, the Waimea Dam will secure the Tasman region’s water supply for the next 100 years.

Read More
Transpower Contract Alexandra

Pylon Network Upgrade

This significant project involved Allied Concrete’s Alexandra plant upgrading 570 pylons across a 228-kilometre network.

Read More
Invercargill CBD Mall development

Invercargill CBD Redevelopment

A brand new CBD is on the way for Invercargill.

Read More
CRL5

City Rail Link

The City Rail Link (CRL) is the largest transport infrastructure project ever to be undertaken in New Zealand.

Read More
  • Previous
  • You're on page 1
  • 2
  • 3
  • 4
  • 5
  • Next
About
  • History
  • Our People
  • Our Projects
    • Dam Bank
    • Wind Farm
    • Waimea Dam
    • Pylon Network Upgrade
    • Invercargill CBD Redevelopment
    • City Rail Link
    • Egyptian Gardens
  • News
  • Sustainability
  • Awards
Sitemap | Privacy Policy | Terms & Conditions
© 2022 Allied Concrete  |  Website Design by Harvey Cameron
HWR | H. W. Richardson
A member of the HWR group of
transportation companies