Allied READYFloorDRAMIX ready

Cost Calculator

m2
MPa

Traditional system: mesh and concrete

mm
 —  m3
$  
$ —   
  cover / m2 *  
$ $ / sheet  —  $ —  per m2
$ each 1 $ —  per m2
$ $ / m2 1 $ —  per m2
$   $ —  per m2
$ —  per m2

READYfloor

mm
 —  m3
$ m3
$ — 
 — 
$ per m2
$ —  per m2

Savings

$ — 
$ — 
 — %



* Waste only includes the lost area due to mesh overlaps, it does not include unused material.
** READYfloor slabs rarely require a pump, the concrete is pre-reinforced and the mix can be placed directly from the chute.

Prices are indicative and this information should be used as a guide only, it should not be used for tender or pricing purposes.