Skip to content
0800 4 ALLIED 0800 425 5433
  • About
    • History
    • Our People
    • Our Projects
      • Transforming Invercargill's Inner City
      • Isaac's Hot Mix Plant
      • Beaumont Bridge
      • New Zealand's First Passive House
      • Low carbon concrete range
      • Ōpuke Thermal Pools & Spa
      • City Rail Link
      • Waimea Dam
      • Dam Bank
      • Wind Farm
      • Waimea Dam
      • Pylon Network Upgrade
      • Invercargill CBD Redevelopment
      • Egyptian Gardens
    • News
    • Sustainability
    • Awards
  • Products
    • Decorative Concrete
      • READY Colour
      • READY Exposed
      • READY Glow
      • READY Polished
    • Low Carbon Concrete
      • Ecrete™
    • Flooring and Foundations
      • READY Floor
      • SuperSlab
      • READY Now
      • SuperSlab+
    • Structural Concrete
      • Ready Mix Concrete
    • Concrete Sealers, Acids and Thinners
      • READY Products
  • Technical Info
    • Design Resources
    • Concrete Tips & Tricks
    • Tools
      • Ready Floor Calculator
      • Concrete Calculator
      • Weather Advisory
    • Quality Control
    • Terms of Trade
    • Health & Safety
  • Careers
  • Contact
    • Plant Locator
    • General Enquiry
    • Our Team
  • Request A Quote
  • My Concrete App
  • Home
  • Technical Info
  • Current: Health & Safety

Health & Safety

Allied Concrete believe in providing a safe working environment for all staff and company stakeholders to ensure everyone gets home safe every night. 

Ready Mixed Concrete Supplier - Allied Concrete

Best Practice for Safe Deliveries to Site

Important information relating to concrete deliveries and safety around our trucks.

Find Out More
Super Slab Pour Hi res 20150713 0083

Safety Precautions When Working with Wet Concrete

Understand the associated health risks when working with wet concrete and what measures to take to protect against burns.

Find Out More
ALLIED CONCRETE 2015 104 resized

Concrete Blow Back and Pump Back Policy

View our policy for Concrete blow back or pump back procedures.

Find Out More
Technical Info
  • Design Resources
  • Concrete Tips & Tricks
  • Tools
    • Ready Floor Calculator
    • Concrete Calculator
    • Weather Advisory
  • Quality Control
  • Terms of Trade
  • Health & Safety
Sitemap | Privacy Policy | Terms & Conditions
© 2023 Allied Concrete  |  Website Design by Harvey Cameron
HWR | H. W. Richardson
A member of the HWR group of
transportation companies