Search Results

Assuming is required, the following results were found.

Mahoenui Mansion

Our Auckland Team were provided with the challenge of producing a white exposed aggregate mix for a less than typical driveway as requested by the client.

The...

Go to page

Lower Hatea Bridge

Allied Concrete is excited to announce a Transfield/ McConnell Dowell Joint venture has won the Infrastructure Award - Commended, at the 2013 Concrete Awards for the...

Go to page

Mapua Waterfront Park

Allied Concrete proud to supply the concrete for the Mapua Waterfront Park in Nelson for the main contractors in stage two of the development, Coman Construction...

Go to page

Concrete Crack Control

Because ready mixed concrete is delivered in a fluid state then subsequently becomes a solid, the chemical and environmental influences on the change may sometimes causes cracking.

It...

Go to page

Winter Concreting

Concrete can be successfully placed, finished and cured in winter so long as you understand what affect low temperatures have on the fresh and early age...

Go to page

Admixtures for Cold Weather

Cold weather provides new challenges to the concrete worker. Cold weather can increase concrete set times, retard concrete stiffening and slow its strength gain.

It is also interesting to...

Go to page

Hot Weather Concreting

The laying of concrete in hot weather places extra demands on the concrete worker.

Extra water required - For the same slump concrete requires more water when...

Go to page

Admixtures for Hot Weather

The summer time effects of wind, temperature, and air humidity can collectively have a detrimental impact on the performance of concrete.

Higher temperatures cause a faster rate of...

Go to page

Avoiding Colour Variations

Architectural and coloured concretes are susceptible to colour variations and other defects, which can detract from the appearance of the finished areas. Colour variations can appear...

Go to page

Plastic Cracking

Plastic cracking occurs when the concrete you have just placed and finished is exposed to warm drying wind, and then develops cracking over the surface of...

Go to page