Ordering Concrete - The Basics
The following information is required before ordering concrete.
Please note that it is better to advise the concrete company in advance of your requirements.
Concrete Strength Required
This is measured in Mega Pascals (Mpa).
Slump (i.e. how runny you need your concrete)
This varies with each situation. Our support team will help you at the time of order.
Delivery Address
Physical location of the building site.
Payment Method
Cash / Cheque (subject to prior check) / EFTPOS.
Quantity Required (in cubic metres)
Use our concrete calculator to find out how much you need.
Truck Access to Site?
A standard truck is 2.5 metres wide, 7 metres long, has a turning circle of 16 metres and weighs 20 tonnes fully laden.
Concrete Pump Required?
Yes / No
Special Site / Customer Details
Anything else you think we should know is helpful to us when you order.
